Sunday, April 18, 2021

Cabin Bathroom Remodel +

 Now that the demo is done, Jen started painting the walls.  We went with a darker color which was controversal, but it turned out really sharp.  The drywall had been up for a long time and soaked up a lot of paint, which made the first coat challenging.  But once the first one was up the second went quicker.


While Jen worked on that I tried the old spray painter that Greg had in the basement.  It didn't work as well as I had hoped.  Paint came out and covered the wall, but it kind of made a mess too.


Once that was done I worked on building some shelves for the room as well.  Since we don't know what we want to do with the floor yet and I want to keep as much off the floor as possible I went with a hanging design.  I used old wood that had been shelves in other parts of the basement that we had taken done.


No comments: