Sunday, April 25, 2021

Cabin Bathroom Remodel ++

 On Sunday we finished most of the remove work.  The floor is done (except for some final caulking), the sink is in (except for the water lines, since the ones I had were too short), the toilet is working, still need to finish the cabinet door, and the electric heat is back up (after a little tingle, I really wish all electricity came through the switch first).

We reused the medicine cabinet, but I did something pretty cool.  I opened up the wall and recessed it.  This will give us a little more head space above the sink.  We all took the opportunity to sign the back of the wall of course.

Fortunately, the drywall behind there is covered in paneling as some of the nails pulled through when I cut out the stud.  Overall I am pretty happy with how it turned out.  We are excited to get back up and finish off the few final remaining parts of it and get to work on the next project!





No comments: